extended searching

Office chamber

The office chamber has cross-vaulted ceilings. Plaster layer before the recovery was largely blackened, what proves that this particular room was used as a scullery / back kitchen. There were no complex restoration processes required at that room due to lack of any special architectural findings. In addition to that, the surface layer of the walls was blackened thoroughly reaching plastered layers of the walls, which meant no guarantee more wet layers wouldn’t trigger brown soot stains or leaks coming out to the surface.

kancelář

Current weather

Monday 4. 5.
sky is clear
22 °C 9 °C
wind S, 6.09 m/s
humidity 40 %
pressure 1015 hPa
Tuesday 5. 5.
light rain
21 °C 11 °C
wind S, 8.4 m/s
humidity 46 %
pressure 1009 hPa
rain 0.16 mm
Wednesday 6. 5.
light rain
20 °C 12 °C
wind SW, 3.92 m/s
humidity 67 %
pressure 1011 hPa
rain 3.34 mm
Thursday 7. 5.
moderate rain
13 °C 10 °C
wind N, 3.56 m/s
humidity 98 %
pressure 1013 hPa
rain 40.71 mm