extended searching

Office chamber

The office chamber has cross-vaulted ceilings. Plaster layer before the recovery was largely blackened, what proves that this particular room was used as a scullery / back kitchen. There were no complex restoration processes required at that room due to lack of any special architectural findings. In addition to that, the surface layer of the walls was blackened thoroughly reaching plastered layers of the walls, which meant no guarantee more wet layers wouldn’t trigger brown soot stains or leaks coming out to the surface.

kancelář

Current weather

Tuesday 14. 4.
light rain
15 °C 8 °C
wind SW, 2.69 m/s
humidity 58 %
pressure 1018 hPa
rain 3.82 mm
Wednesday 15. 4.
light rain
10 °C 8 °C
wind N, 2.59 m/s
humidity 92 %
pressure 1023 hPa
rain 0.44 mm
Thursday 16. 4.
light rain
15 °C 8 °C
wind W, 1.74 m/s
humidity 69 %
pressure 1021 hPa
rain 1.76 mm
Friday 17. 4.
light rain
12 °C 6 °C
wind N, 4.15 m/s
humidity 69 %
pressure 1021 hPa
rain 0.56 mm