extended searching

Office chamber

The office chamber has cross-vaulted ceilings. Plaster layer before the recovery was largely blackened, what proves that this particular room was used as a scullery / back kitchen. There were no complex restoration processes required at that room due to lack of any special architectural findings. In addition to that, the surface layer of the walls was blackened thoroughly reaching plastered layers of the walls, which meant no guarantee more wet layers wouldn’t trigger brown soot stains or leaks coming out to the surface.

kancelář

Current weather

Friday 23. 10.
few clouds
12 °C 3 °C
wind S, 5.5 m/s
humidity 59 %
pressure 1020 hPa
Saturday 24. 10.
light rain
10 °C 5 °C
wind S, 5.22 m/s
humidity 74 %
pressure 1018 hPa
rain 0.63 mm
Sunday 25. 10.
light rain
11 °C 3 °C
wind S, 8.36 m/s
humidity 59 %
pressure 1012 hPa
rain 3.47 mm
Monday 26. 10.
light rain
11 °C 5 °C
wind SW, 5.02 m/s
humidity 75 %
pressure 1019 hPa
rain 0.15 mm