extended searching

Office chamber

The office chamber has cross-vaulted ceilings. Plaster layer before the recovery was largely blackened, what proves that this particular room was used as a scullery / back kitchen. There were no complex restoration processes required at that room due to lack of any special architectural findings. In addition to that, the surface layer of the walls was blackened thoroughly reaching plastered layers of the walls, which meant no guarantee more wet layers wouldn’t trigger brown soot stains or leaks coming out to the surface.

kancelář

Current weather

Thursday 20. 8.
heavy intensity rain
30 °C 17 °C
wind SW, 10.99 m/s
humidity 50 %
pressure 1011 hPa
rain 14.07 mm
Friday 21. 8.
light rain
27 °C 18 °C
wind W, 3.07 m/s
humidity 60 %
pressure 1014 hPa
rain 1.03 mm
Saturday 22. 8.
heavy intensity rain
17 °C 15 °C
wind N, 2.72 m/s
humidity 98 %
pressure 1014 hPa
rain 30.01 mm
Sunday 23. 8.
sky is clear
26 °C 13 °C
wind NE, 3.65 m/s
humidity 66 %
pressure 1018 hPa